What are the general requirements for the installation of construction baskets

Release date: 2020-07-20 16:30:56    Visits: 768

1. The hanging basket for high altitude operations should be equipped with safety ropes and safety locks for safety belts dedicated to the operators. The safety rope should be fixed in a reliable position of the building and must not be connected to any part of the hanging basket, and should meet the following requirements:
1) The safety rope should meet the requirements of the current national standard "Safety Belt" GB6095, and its diameter should be consistent with the specifications of the safety lock;
2) The safety rope must not be loose, broken or knotted;
3) The parts of the safety lock should be intact and complete, and the specifications and direction signs should be clearly identifiable.
2. The hanging basket should be equipped with a protective shed to prevent falling objects from high places from causing injury to the operators.
3. The upper limit device should be installed on the hanging basket, and the lower limit device should be installed.
4. When using the hanging basket, the obstacles that affect the normal operation of the hanging basket should be removed. In the area under the hanging basket that may cause falling objects injury, set up a safety isolation zone and warning signs, and personnel and vehicles are not allowed to stay or pass.
5. When performing installation and maintenance operations in the hanging basket, the operator should wear a tool bag.
6. The use of overseas gondola equipment should have a Chinese instruction manual; the safety performance of the product should comply with my country''''s current standards.
7. The hanging basket shall not be used as a vertical transportation equipment, and the hanging basket shall not be used to transport materials.
8. There should be no more than 2 operators in the hanging basket.
9. When the gondola is working normally, personnel should enter the gondola from the ground, and not enter or leave the gondola from the top of the building, windows, etc. or other holes.
10. Workers in the hanging basket should wear safety helmets, wear safety belts, and correctly hang the safety lock on the independent safety rope.
11. The load balance should be maintained in the gondola platform, and overload operation is strictly prohibited.
12. When the hanging basket is in lifting operation, the height difference between the two ends of the working platform shall not exceed 150mm.
13. When a hanging basket with a centrifugal trigger safety lock stays in the air for operations, the safety lock should be locked on the safety rope; when starting the hanging basket in the air, the hanging basket should be lifted to relax the safety rope before opening the safety lock. Do not forcibly pull the safety lock opening handle when the safety rope is under force; do not fix the safety lock opening handle in the open position.
14. For hanging baskets with a hanging height of 60 meters or less, a hanging basket platform with a long side not greater than 7.5 meters should be used; for those with a hanging height of 100 meters or less, a hanging basket platform with a long side not greater than 5.5 meters should be selected; If the suspension height is more than 100 meters, a hanging basket platform no more than 2.5 meters should be used.
15. When spraying operations or cleaning operations with corrosive liquids, anti-pollution protection measures should be taken for the hoist, safety lock, and electrical control cabinet of the hanging basket.
16. When the cantilever structure moves in parallel, the gondola platform should be lowered to the ground and the wire rope should be in a relaxed state.
Contact us
National Hotline:
0510-82842412

Contact: Mr Zhu 138 6179 2014

Leasing department:

Mr Wang 139 2114 6671

Tel0510-82842412

Fax0510-82842412

Emailyoyoyanjin@163.com

AddNo.570 Xitai Road Meicun New district in wuxi city, jiangsu province

Home   |    About us   |    News   |    Product   |    Contact us   |    Back to top

主站蜘蛛池模板: 最近中文字幕无吗免费视频| 欧美色综合高清视频在线| 色视频www在线播放国产人成| 中文字幕有码热在线视频| 狠狠干97| 黑人中文字幕在线精品视频站| 欧美性色xo影院在线观看| 99日韩| 国产免费黄| 亚洲国产www| 国产成人精品综合在线观看| 欧美中文字幕第一页| 亚洲国产成人精品久久| 国产福利一区二区在线观看| 99视频网| 成人国产三级精品| 国产高清亚洲| 中文字幕在线观看免费| 国产成人黄色| 国产成人黄色在线观看| 久久就是精品| 亚洲九九精品| 在线不卡一区二区| 亚洲无线码在线一区观看| 亚洲精品高清视频| 欧美午夜三级我不卡在线观看| 91在线播放网站| 91av在线免费观看| 欧美日韩国产网站| 性做久久久久免费看| 黄色网站视频在线观看| 久久久精品久久久久久| 一级a毛片免费| 天天做天天爽| 亚洲综合在线观看一区| 日韩精品国产精品| 91精品免费看| 超pen个人视频国产免费观看| 国产一线大片免费观看| 一区二区在线不卡| 精品一区二区三区视频|